Worked with owners project team to provide engineering, procurement, project management, and installation of wet and dry frac sand processing equipment, plus silo loadout system. 200 tph processing capacity.
Worked with owners project team to provide engineering, procurement, project management, and installation of wet and dry frac sand processing equipment, plus silo loadout system. 200 tph processing capacity.
Turnkey design, engineering, and construction of a new 400 TPH coal preparation plant and material handling system. Designed to wash very fine metallurgical coals with an emphasis on minimizing product sulfur content. The material handling system includes a raw coal truck dump, raw coal stacking tube, and underground reclaim tunnel. Product handling includes a clean coal reclaim tunnel and a 2600 TPH train loadout.
Turnkey design, engineering, procurement, and installation of 400 tph wet sand processing plant to replace temporary plant installed in original project. Engineering and installation of 200 tph fluid bed dryer to supplement existing dryer installed in original project. Two additional 3000 ton dry product storage silos installed to supplement original 3000 ton silo.
CLIENT | PROJECT | DATE | ESTIMATED VALUE (USD) |
---|---|---|---|
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |
xxx | x | x | $x,000,000 |